×
header
Phoenix

Toll-free 1 (855) 936-4081

Address 8415 W. Sherman Street
Tolleson, AZ 85353

GET DIRECTIONS

Design
We analyze and complete designs with a keen eye on cost, constructability, availability of materials, etc. One of our most significant contributions during the pre-construction phase is our detailed drawings and specifications prior to subcontractor bidding.
Budget Estimating
We begin to confirm the estimated project cost immediately after selection using the most up- to-date estimating systems available in the industry.
Value Engineering
We identify components that are likely to yield the most effective cost savings, while retaining programmatic and design intent.
Scheduling
We use Microsoft Project as our primary scheduling software, which is used to illustrate project manpower, equipment resources, and cash flow forecasts.
Constructability Analysis
Our team reviews the plans, checking for potential construction issues and evaluating alternatives, and develops a construction plan.
Cost Control
The preliminary budget functions as a cost model and, along with the schedule, help to focus and monitor project decisions. As plans are completed and cost decisions made, we compile the information and incorporate it into the budget.
Quality Control
Our quality assurance manager, project manager, and superintendent are fully responsible for the coordination and review of the project documents and site conditions to determine constructability.